Biogas upgrading is at the heart of renewable gas production, transforming organic waste into biomethane—a clean, local, and scalable energy source. But before biomethane can enter the gas grid, it must be odorized to ensure public safety and rapid leak detection.

 

This comes with real constraints: limited installation space, low gas flow rates (20 to 3000 sm³/h), and a strong need for simplicity and reliability. The LVO meets all of these challenges with a compact design, low maintenance requirements, and long refill intervals—making it easy to integrate into existing upgrading packages without added complexity.

The result is reduced operational risk and stronger project bankability, giving operators and stakeholders greater confidence in long-term performance.

 

YZ Systems supports the full renewable gas value chain—from biogas upgrading facilities to BioCNG mobility projects—with solutions engineered for real-world constraints.

LVO-Case-Study

Country

Industry

Your request will be forwarded to the relevant individuals to assist with your request.
By clicking 'Send' you are authorizing YZ Systems to contact you so that we may fulfill your request, as well as to communicate with you regarding our products and services.
Terms and Conditions
Privacy Policy

(* required fields)

This site is protected by reCAPTCHA.